![]() It was in use from late April or early May until late November each season, and sometimes throughout winter. With its 72 large buckets, the dredge excavated gravel at the rate of 22 buckets per minute, processing 18,000 cubic yards (14,000 m 3) of material per day. It is the largest wooden-hulled dredge in North America. It is now located along Bonanza Creek Road 13 kilometres (8.1 mi) south of the Klondike Highway near Dawson City, Yukon, where it is preserved as one of the National Historic Sites of Canada. 4 is a wooden-hulled bucketline sluice dredge that mined placer gold on the Yukon River from 1913 until 1959. Convenience: By bringing solutions onsite to mining locations, we are providing customers with a safe, convenient, turn-key approach to managing and processing their waste onsite.Historic gold-mining dredge in Yukon, Canada Dredge No.Cost Savings: More often than not, our environmental solutions enable mines to recover and reuse enough product to cover the costs of the services, and then some.It has never been more crucial for companies in the mining sector to abide by increasingly stricter environmental regulations, and go above and beyond compliance to build a profile as sustainability leaders. Environmental Performance: At the end of the day, these solutions are turning waste into raw material and products.Value Recovery: Instead of disposing of it, processing waste through dredging and dewatering allows mines to recover minerals that can be reused in the mine’s processes.If mines extract them, they can use them. Today, the materials in these tailing ponds are seen as valuable and potentially usable. Tailings Dredge Dredging can be a very effective and economical means of extracting tailings from a storage facility.įor decades, mines have been dealing with their waste by disposing of tailings in a pond. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |